Substitution of two 245-kV oil cable systems with XLPE cables which includes the dismantling of existing mountings and the oil circulation system in the power plant Roßhag. The replacement work in the connecting tunnels between the GIS switchgear in the power house and the outdoor terminations on the transformer station, which have slopes of up to 60 °, took place under successive operation of the respective other system.